News
Georgia Power’s EV charger rebate: confirm the December 31, 2026, install date
Georgia Power lists $150 per qualifying Level 2 charger, up to two per account. Official terms and conditions have been recorded as requiring installation by December 31, 2026, while funds last, but an official FAQ has also been recorded with a later date. Confirm with Georgia Power.
By National Rebates Staff
Published · Updated
Last verified against the program administrator’s page:
Georgia Power’s official EV rebates page lists $150 per qualifying Level 2 charger, with a limit of up to two chargers per account. The directory listing records a conflict in the official materials: the terms and conditions have been recorded as requiring installations by December 31, 2026, while funds last, while an official FAQ has been recorded as describing a window of January 1, 2026, through December 31, 2028. This article does not choose between those dates. Confirm the current install-by date, amount, and remaining funds directly with Georgia Power before buying a charger or applying.
Other Georgia listings include Level 2 charger rebates of $250 at Carroll EMC, GreyStone Power, and Jackson EMC, which apply only to those cooperative members. GreyStone Power’s official materials describe payment as a check, limited to one per household. TVA EnergyRight heat pump rebates appear only where a participating local power company serves the home, not statewide in Georgia.
This directory is not a Georgia Power or cooperative website, and this article does not promise approval, a specific deadline, or remaining funds. Confirm current rules with the relevant administrator before buying equipment or applying.
Sources
Related program
GEORGIA
Electric Vehicles
Georgia Power — Residential EV Charger Rebate
$150 per Level 2 charger (up to 2 per account)
Updated
Wall/pedestal 208/240V on dedicated circuit; new; not from a utility marketplace; SF/townhome owner; self-install w/ attestation; possible field audit; no EV ownership needed; 6 months. Program year or deadline as published: T&Cs: installs by Dec 31, 2026 while funds last; FAQ: Jan 1, 2026–Dec 31, 2028. Published structure: Flat up to documented cost. Confirm current rules with the administrator at the official program page. This directory is not an official government or utility site, and this listing does not promise approval.
Program detailsGEORGIA
Electric Vehicles
GreyStone Power — Level 2 EV Charger
$250 check (1 per household)
Updated
Hardwired & mounted; within 90 days; excludes marketplace purchases/free chargers. Program year or deadline as published: Current. Published structure: Flat. Confirm current rules with the administrator at the official program page. This directory is not an official government or utility site, and this listing does not promise approval.
Program detailsGEORGIA
Electric Vehicles
Carroll EMC — Level 2 Home Charger
$250 one-time
Updated
New, not portable; 45 days. Program year or deadline as published: Current. Published structure: Flat. Confirm current rules with the administrator at the official program page. This directory is not an official government or utility site, and this listing does not promise approval.
Program detailsGEORGIA
Electric Vehicles
Jackson EMC — Level 2 EV Charger
$250 per charger (up to 2 per home)
Updated
New L2 bought in 2026; mail-in form + proof of purchase + EV bill of sale/registration; excludes adapters/install. Program year or deadline as published: 2026 until funding runs out; form rev. 12/12/2025. Published structure: Flat. Confirm current rules with the administrator at the official program page. This directory is not an official government or utility site, and this listing does not promise approval.
Program details