WISCONSIN
Electric Vehicles
Jump River Electric Cooperative (JREC) — Energy Sense 2026 EV Charging Station
$500 Level 2 charger; $1,000 EV smart charger w/ integrated metering; + up to $200 meter wiring
Level 2 only; must be on JREC TOU/off-peak rate; 2026 purchases; apply within 3 months; bill credit ≤$500, check above; EV ownership not stated; unknown whether TOU needs a separate load-management meter. Program year or deadline as published: 2026. Published structure: Flat, cannot exceed purchase cost. Confirm current rules with the administrator at the official program page. This directory is not an official government or utility site, and this listing does not promise approval.
Program details